Fire RiskSpecialists

    Houses in multiple occupation

    HMO fire risk assessment from £99

    HMO fire risk assessments for landlords and licence applications across London. IFSM-registered assessors, LACORS-aligned reports in 24 hours. From £99.
    IFSM registeredNFRAR listed24-hour reports£5M insured
    Assessor testing an interlinked smoke alarm on the landing of a London house in multiple occupation
    AudiKiaGB NewsBudgens
    The short answer

    Houses in multiple occupation require a written fire risk assessment, and councils routinely request one as part of an HMO licence application or renewal. We assess shared areas against the Regulatory Reform (Fire Safety) Order 2005 and LACORS residential fire safety guidance, and issue a licence-ready report within 24 hours from £99.

    020 3951 4856

    £99

    Starting price, all inclusive

    24hr

    Written PAS 79 report

    1,000+

    Buildings assessed

    £5M

    Public liability insurance

    What you get

    Everything included, nothing subcontracted.

    What is covered as standard on every hmo assessments we carry out.

    Licence ready

    Formatted for council HMO licensing officers, first time.

    LACORS aligned

    Assessed against the guidance councils actually enforce.

    Fast turnaround

    24-hour reports so a licence deadline never slips.

    Practical fixes

    Costed, proportionate recommendations, not gold-plated ones.

    When does an HMO need a fire risk assessment?

    Any property occupied by three or more people forming more than one household with shared facilities is an HMO, and its shared areas fall under the Fire Safety Order. Licensable HMOs — generally five or more occupants — will almost always be asked for the assessment by the licensing team, and selective licensing schemes in many London boroughs extend that further.

    The legal duty for HMO landlords

    As the landlord of an HMO you are the responsible person for the shared parts of the property under the Fire Safety Order, in addition to your separate duties under the Management of Houses in Multiple Occupation (England) Regulations 2006, which specifically require you to ensure adequate fire precautions are maintained. Where a property requires mandatory or additional licensing under the Housing Act 2004, the local authority will assess the fire precautions as part of granting or renewing the licence, and can attach conditions or refuse the licence if precautions are inadequate. Operating a licensable HMO without a licence, or with one that has expired, is a criminal offence carrying substantial fines.

    What we check in an HMO

    HMO failures are usually mundane and cheap to fix if they are found early: a missing self-closer, a wedged fire door, an interlinked alarm on the wrong grade, or a lock that needs a key from the inside.

    • Alarm system grade and category (typically Grade D or A, LD2/LD1)
    • Fire doors, self-closers, intumescent strips and cold smoke seals
    • Protected escape route from every storey
    • Emergency lighting where escape routes are unlit
    • Kitchen and cooking arrangements, and their position relative to escape routes
    • Locks, thumb-turns and final exit operation without a key
    • Furnishings, storage and electrical safety in shared areas

    What a typical HMO report finds

    Across the HMOs we assess, the most common issues are self-closers that tenants have unscrewed or wedged because a door bangs shut too hard, kitchens with cooking facilities positioned too close to the only escape route, and alarm systems installed to a lower grade or category than the property's layout actually requires — often because the system was fitted before a loft conversion or extra letting room changed the building's risk profile. Locks fitted with a key-operated deadlock on the final exit, rather than a thumb-turn, is another recurring and easily overlooked failure that would trap occupants trying to escape in the dark.

    Timescales for HMO assessments

    Most HMOs can be surveyed within a few working days of enquiry, and we prioritise bookings against licence application and renewal deadlines where you tell us the date in advance. The site visit itself typically takes 30 to 90 minutes depending on the number of storeys and lettable rooms. The written, licence-ready report is issued within 24 hours of the visit, giving you time to instruct any works and still meet the council's deadline.

    What affects the price of an HMO assessment

    Price is driven mainly by the number of storeys and the number of lettable rooms, since both affect escape route length and alarm system requirements. A small two-storey HMO with four rooms is priced differently to a converted five-storey property with ten rooms and a basement. Portfolio landlords with several HMOs across London benefit from volume pricing and a single point of contact for scheduling.

    Common failures in London HMOs

    Beyond doors and alarms, we frequently find storage — bikes, suitcases, recycling — left in hallways and stairwells that narrow the escape route below an acceptable width, extension leads and portable heaters used as a permanent substitute for inadequate heating, and converted loft rooms let as bedrooms without the protected route or alarm coverage that an additional storey requires. Landlords who have not updated the fire precautions since a change in occupancy — for example, moving from a family let to individual room lets — are particularly likely to be non-compliant without realising it.

    How to prepare for an HMO assessment

    Make sure the assessor can access every room, including any locked storage, loft space and the garden or yard if it forms part of an escape route. Have your alarm system's installation and last service certificate to hand if you have one, along with any electrical (EICR) and gas safety certificates, since these help the assessor cross-check what's actually installed against what should be there for the property's layout.

    Getting the licence through first time

    Licensing officers see hundreds of assessments and reject the vague ones. Our reports name the specific standard applied, record the alarm grade and category, and give the landlord a dated action plan — which is exactly what the officer needs to sign it off without a second round of correspondence.

    What happens after the report

    You receive a report you can submit directly with your licence application or renewal, together with a prioritised, costed action plan for anything that needs putting right. Where the council queries a specific point, we can respond directly to clarify the standard applied, and we're available to reassess once remedial works are complete if the licensing team asks for confirmation.

    The difference

    Us versus a typical assessment.

    Most of the reports we are asked to review were produced remotely, from a template, by someone who never saw the building.
    Comparison between Fire Risk Specialists and a typical commodity fire risk assessment for HMO assessments
    AspectFire Risk SpecialistsTypical assessment
    Alignment with licensingExplicitly aligned to LACORS guidance councils applyGeneral FRA template not tailored to licensing officers
    Alarm grade/category recordedStated explicitly against the property's actual layoutSometimes assumed rather than checked against layout changes
    Turnaround against deadlines24-hour report, bookings prioritised against licence datesNo guaranteed turnaround
    Cost of recommendationsProportionate, costed action planMay over-specify works beyond what's required
    Council correspondenceWe can respond directly if the licensing team queries a findingLandlord left to interpret and respond alone
    Portfolio landlordsVolume pricing and single point of contactEach property quoted and scheduled separately

    How it works

    From enquiry to compliant.

    1. 01

      Quote

      Priced in minutes, online or over the phone.

    2. 02

      Book

      Survey slots within days, same-day when urgent.

    3. 03

      Assess

      An in-house assessor attends and inspects in person.

    4. 04

      Report

      PAS 79 report and prioritised actions in 24 hours.

    Trusted by the teams we work for across London

    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood
    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood

    Frequently asked questions

    Book your hmo assessments from £99.

    Tell us about the building and we will price it in minutes. In-house IFSM-registered assessors, PAS 79 report within 24 hours of the visit.
    020 3951 4856

    No obligation. We answer the same day.

    Last word

    Ready when you are.

    Quote in 60 seconds. Assessor on site this week. Compliant report in your inbox within 24 hours. That's the whole process.

    020 3951 4856
    Transparent pricing No obligation 1,000+ assessments 100% compliance guarantee
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · 4.9 Google
    4.9 rated
    ·1,000+ done·
    Guaranteed
    Call