Fire RiskSpecialists

    Residential blocks

    Fire risk assessments for blocks of flats from £99

    PAS 79 fire risk assessments for blocks of flats and communal areas in London. Type 1 to Type 4, Fire Safety Regulations 2022 compliant. From £99.
    IFSM registeredNFRAR listed24-hour reports£5M insured
    Fire risk assessor checking a fire door closer in the communal stairwell of a London block of flats
    AudiKiaGB NewsBudgens
    The short answer

    Every block of flats in England must have a written fire risk assessment of its communal areas, and since the Fire Safety (England) Regulations 2022 additional duties apply to flat entrance doors, communal fire doors and buildings over 11 metres. We deliver Type 1 to Type 4 assessments for freeholders, RTM companies and managing agents, with PAS 79 reports in 24 hours.

    020 3951 4856

    £99

    Starting price, all inclusive

    24hr

    Written PAS 79 report

    1,000+

    Buildings assessed

    £5M

    Public liability insurance

    What you get

    Everything included, nothing subcontracted.

    What is covered as standard on every assessment we carry out.

    Type 1 to Type 4

    From standard common-parts surveys to destructive sampling of flats.

    2022 Regulations

    Fire door checks, wayfinding signage and resident information duties.

    Leaseholder-ready

    Plain-English reports you can share with residents without alarm.

    Portfolio pricing

    Consolidated reporting and discounts across multiple blocks.

    What is in scope in a block of flats?

    The assessment covers the communal parts — entrance halls, stairwells, corridors, bin and bike stores, plant rooms, risers, roof spaces and external escape routes. Individual flats behind their own front door are generally out of scope, but the flat entrance doors themselves are firmly in scope because they form part of the compartmentation protecting the escape route.

    Type 1, 2, 3 and 4 explained

    Choosing the right type matters. Most blocks need a Type 1; a Type 3 or 4 is usually triggered by suspected construction defects, a history of fire spread, or lender and insurer requirements.

    • Type 1 — common parts only, non-destructive. The standard assessment for most blocks.
    • Type 2 — common parts with destructive inspection where construction is in doubt.
    • Type 3 — common parts plus a sample of flats, non-destructive.
    • Type 4 — common parts plus flats, destructive. The most thorough option.

    The legal duty for freeholders and managing agents

    The Regulatory Reform (Fire Safety) Order 2005 places the duty on whoever has control of the common parts, usually the freeholder or their appointed managing agent. The Fire Safety Act 2021 clarified that this duty explicitly extends to the structure, external walls (including cladding and balconies) and flat entrance doors, closing an ambiguity that had previously let some buildings treat those elements as out of scope. Getting the responsible person wrong — assuming, for example, that an RTM company has no duty because a managing agent is instructed — is one of the most common governance failures we see, and it does not protect the freeholder from enforcement action.

    Your duties under the Fire Safety (England) Regulations 2022

    In relevant residential buildings with a top storey more than 11 metres above ground, check communal fire doors at least every three months and use best endeavours to check flat entrance doors at least every 12 months. Resident information applies at all heights within scope. Wayfinding signage, building plans and a secure information box belong to the separate high-rise tier: at least 18 metres or at least seven storeys. A single FRA visit does not discharge the recurring duties.

    Stay-put or simultaneous evacuation

    Getting the evacuation strategy right is the single most consequential judgement in a block assessment. Where compartmentation is compromised, a stay-put policy may no longer be safe and an interim measure such as a common alarm or waking watch may be required. We say clearly which strategy the building supports and what would need to change to restore stay-put.

    What a typical block assessment finds

    The most frequent findings in London blocks are fire doors that no longer close and latch correctly, self-closers removed by residents for convenience, communal storage of bikes, mobility scooters and rubbish in stairwells and lobbies, and emergency lighting that has never been tested since installation. On older stock we also commonly find that a fire risk assessment exists but has not been updated since a change of use, an extension, or works to the external wall — which means it no longer reflects the building as it actually stands.

    Timescales for blocks of flats

    A Type 1 assessment on a typical low or mid-rise block can usually be booked within a few working days and completed on site in one to three hours depending on the number of units and the extent of the communal areas. Type 3 and Type 4 assessments, which involve sampling or inspecting individual flats, take longer to arrange because they require coordinated access with leaseholders and tenants, and are typically scheduled over one or more visits. The written report follows within 24 hours of the final site visit in all cases.

    What affects the price for a block

    Price depends on the number of units, the number of staircases and cores, whether the building has commercial units at ground floor, the extent of plant and storage areas, and which Type of assessment is required. A Type 1 on a small purpose-built block of eight flats with a single core is priced very differently to a Type 3 assessment on a 200-unit development with multiple cores and basement parking. We quote a fixed price once we understand the building's layout and unit count.

    How to prepare for a block assessment

    Managing agents get the most useful report when they can supply the building's fire strategy or previous fire risk assessment, any recent works records (particularly to cladding, balconies or communal doors), and access arrangements for plant rooms, risers and locked cores. Where a Type 3 or Type 4 assessment requires access to individual flats, giving leaseholders reasonable notice avoids the visit being delayed or incomplete.

    What happens after the report

    You receive a PAS 79 report covering the communal areas, a clear statement of the evacuation strategy the building currently supports, and a prioritised action plan. This is the document you use to demonstrate compliance to enforcement officers, to support service charge budgeting for remedial works, and to share with leaseholders and residents in a form that explains findings without causing unnecessary alarm.

    The difference

    Us versus a typical assessment.

    Most of the reports we are asked to review were produced remotely, from a template, by someone who never saw the building.
    Comparison between Fire Risk Specialists and a typical commodity fire risk assessment for Blocks of flats
    AspectFire Risk SpecialistsTypical assessment
    Assessment type selectionType advised based on construction and history, explained in plain termsType 1 applied by default regardless of building history
    2022 Regulations dutiesFire door checks and signage can be arranged alongside the assessmentOften left for the client to organise separately
    Evacuation strategyExplicit statement of stay-put viability and what would restore itMay be repeated from a previous report without re-testing
    Leaseholder communicationReports written to be shared with residents without causing alarmTechnical language not suited to resident circulation
    Portfolio consistencySame in-house team across a managing agent's whole portfolioDifferent subcontracted assessors per block
    Response to findingsAssessor available to discuss action plan with the RTM or freeholderReport delivered with no further contact

    How fast

    How quickly we can get to you.

    Standard bookings in London are attended within two to five working days. When you have a deadline, this is what happens instead.

    Today

    Same-day survey where we can

    We hold short-notice capacity across London every working day. Call and you get a straight yes or no for your postcode on that call, not a maybe.

    Within 24 hours

    Urgent instructions attended

    Deadline work — a notice, a licence, an insurance renewal, a stalled sale — is placed ahead of the routine diary rather than queued behind it.

    24 hours after the survey

    Written PAS 79 report

    Written by the assessor who attended, with photographs and a prioritised action plan. Anything urgent is raised on site, not held back for the document.

    Same-day attendance depends on assessor availability, the size of the building and access being arranged. We tell you honestly on the call whether today is possible.

    Instant estimate

    What it will cost.

    The same price bands our assessors quote from. Move the property count for portfolio pricing — from two properties upwards the rate drops.
    1. What kind of property?
    2. Which best describes it?

    1 property

    Your estimate

    £349–£449

    3-6 Storey Communal · excluding VAT

    • Written report to British Standards PAS 79, within 24 hours of the visit.
    • Priced on floors, units and complexity — never on a call-out clock.
    • Fixed price confirmed in writing before we book the survey.
    020 3951 4856

    Estimates are guide bands, not a quotation. Unusual layouts, sprinklers, plant rooms or heritage fabric can move the figure either way.

    Before you book

    The honest answers.

    The six things people ask us before instructing — answered without the sales pitch.

    I have been quoted less elsewhere.

    Cheaper quotes are usually desktop reviews or template reports written without a site visit. Ours starts at £99 and always includes an assessor physically walking the building. If you have a cheaper written quote for the same scope, send it over and we will tell you honestly whether it covers you.

    I need it this week.

    Most visits are booked within a few working days and the written report follows within 24 hours of the assessor leaving site. If you have a licensing deadline, an insurer or a fire service inspection date, tell us the date when you enquire and we will work to it.

    How do I know the assessor is competent?

    Every assessment is carried out by an IFSM-registered assessor listed on the National Fire Risk Assessor Register — ours is ID 1576. Competence is exactly what an enforcing authority asks about first, and it is the one thing a cheap report cannot evidence.

    Will the report actually be usable?

    It is written in plain English to British Standards PAS 79, with every finding tied to the duty it satisfies and a prioritised action plan you can hand to a contractor or a managing agent without translation.

    I have more than one building.

    Portfolios are what we do most. One visit schedule, one reporting format, one renewal calendar, and pricing that drops from the second property onwards.

    What if something is found?

    Findings are ranked so you know what has to happen now, what can be planned, and what is advisory. We do not inflate a report to sell remedial work — and we will talk you through the actions on the phone at no cost.

    How it works

    From enquiry to compliant.

    1. 01

      Quote

      Priced in minutes, online or over the phone.

    2. 02

      Book

      Survey slots within days, same-day when urgent.

    3. 03

      Assess

      An in-house assessor attends and inspects in person.

    4. 04

      Report

      PAS 79 report and prioritised actions in 24 hours.

    Awais Sarwar, Founder and Managing Director of Fire Risk Specialists

    Assessor-led

    Awais Sarwar, MSc

    Founder & Managing Director · 10+ years · 1,000+ assessments

    “Every blocks of flats instruction is carried out in person by an IFSM-registered assessor — never passed to a subcontractor.”

    IFSM registered

    NFRAR ID 1576

    MSc Building Surveying · BSc Civil Engineering

    Currently studying an MSc in Philosophy

    Off the clock: cricket, board games, Pokémon TCG and finding London’s best food.

    About Awais

    Trusted by the teams we work for across London

    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood
    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood

    Frequently asked questions

    More from us

    Related services.

    Areas we cover

    All 32 London boroughs, plus Essex, Kent, Surrey and Hertfordshire.

    Book your blocks of flats from £99.

    Tell us about the building and we will price it in minutes. In-house IFSM-registered assessors, PAS 79 report within 24 hours of the visit.
    020 3951 4856

    No obligation. We answer the same day.

    Last word

    Ready when you are.

    Tell us about your property or programme. We agree the scope, fee, visit and reporting times before booking.

    020 3951 4856
    Transparent pricing No obligation Clear, prioritised actions
    4.9 rated
    ·1,000+ done·
    NFRAR registered
    Call