Fire RiskSpecialists

    BS 5839

    Fire alarm design & installation from £199

    Fire alarm design, category specification and installation certification for London buildings. BS 5839 compliant for blocks, HMOs and commercial.
    IFSM registeredNFRAR listed24-hour reports£5M insured
    Red fire alarm control panel and ceiling smoke detector in a modern office
    AudiKiaGB NewsBudgens
    The short answer

    The right fire alarm system depends on the building's use, size, escape route and fire strategy. We design and specify fire alarm systems to BS 5839 for blocks of flats, HMOs, offices, shops and industrial premises across London, then commission and certify the installation so you have a system matched to the actual risk.

    020 3951 4856

    £199

    Starting price, all inclusive

    24hr

    Written PAS 79 report

    1,000+

    Buildings assessed

    £5M

    Public liability insurance

    Standards applied

    BS 5839-1 and BS 5839-6

    Non-domestic and domestic detection respectively

    HMO grading

    Grade A to D

    Aligned to LACORS guidance and licensing conditions

    Design fee from

    £199

    Fixed before work begins

    Servicing interval

    6-monthly

    Weekly user test also required under BS 5839

    What you get

    Everything included, nothing subcontracted.

    What is covered as standard on every assessment we carry out.

    Category matched

    L, P, M and mixed categories specified to the building's actual risk.

    BS 5839 design

    Detection, sounder and control panel layout to British Standard.

    Commissioning

    Installation certification and cause-and-effect testing.

    HMO & block specialists

    Grades and categories aligned to LACORS and building fire strategy.

    Why alarm category matters

    BS 5839-1 divides fire alarm systems into categories: L for life protection, P for property protection, and M for manual systems. Within life protection, L1 provides detection throughout the building while L2, L3 and L4 cover defined areas. Choosing the wrong category is one of the most common and expensive mistakes we see: either an over-specified system that costs more than necessary, or an under-specified one that does not satisfy the fire strategy or the insurer.

    What we design

    We produce a design brief and layout drawing showing detector positions, sounder coverage, control panel location, power supplies, cable routes and integration with other systems such as fire door holders, dampers and suppression systems. The design is matched to the building's fire strategy and evacuation approach.

    • Detector type and spacing for each area
    • Sounder coverage and audibility calculations
    • Control panel and power supply specification
    • Cause-and-effect matrix for interfaces
    • Wiring topology and cable routes
    • Commissioning and handover documentation

    HMO and residential block alarms

    For HMOs, the alarm grade and category must align with LACORS guidance and the property's layout. A small two-storey HMO may need a Grade D, Category LD2 system, while a larger or more complex property may need Grade A with full detection. In blocks of flats, the communal system is usually Category L1, L2 or L3 depending on the evacuation strategy, and must interface correctly with flat entrance doors and stay-put policy.

    Commissioning and certification

    After installation, we commission the system: verify every detector and call point, test sounders and visual alarms, check power supplies and batteries, test interfaces, and record the cause-and-effect logic. You receive a commissioning certificate, a logbook, and an as-fitted drawing. This is the evidence insurers, landlords and enforcement officers expect.

    Common design mistakes

    Common errors include specifying detectors for a flat layout that no longer exists after conversion, omitting sounders in plant rooms or basements, failing to account for high-ceilings or atria, and installing a system without a clear cause-and-effect plan for fire door holders and smoke shafts. We review the building's current use and layout before designing, not the original plans.

    Pricing and turnaround

    Design and specification starts at £199 for a small premises. Installation is priced separately based on the design, building size and cabling routes. Commissioning and certification is included in the installation price. We provide a fixed design fee before any work begins.

    BS 5839-1 and BS 5839-6: which standard applies

    BS 5839-1 covers fire detection and alarm systems for non-domestic premises — offices, shops, industrial units and the communal parts of blocks of flats. BS 5839-6 covers systems in dwellings, including individual flats and HMOs, and sets out the grades (A to F) and coverage levels (LD1 to LD3) that apply to domestic detection. A single mixed-use building can need both standards applied correctly at the same time: BS 5839-1 in the communal escape route and plant areas, BS 5839-6 within each flat. Confusing the two, or applying a domestic grade to a communal system, is a recurring defect we find on take-over surveys of buildings designed by non-specialists. We identify which standard, category and grade apply to each part of the building before any equipment is specified, and record the reasoning in the design brief so it can be checked by a building control body, insurer or fire engineer later.

    Surveying the building before specifying anything

    A reliable design starts with a survey of the building as it actually stands, not the original architect's drawings. We walk every floor, note ceiling heights and voids, identify areas with a higher fire load or ignition risk such as kitchens, plant rooms and stores, and check existing cabling, containment and power supplies that a new or upgraded system might reuse. Where a building has been altered — flats combined or split, a loft converted, a shop unit subdivided — the layout on paper is often wrong, and designing from it produces gaps in coverage or sounders that cannot be heard in the areas that matter. The survey also captures practical installation constraints: listed building restrictions, surface-mounted versus concealed cabling, and access for future maintenance, all of which affect both the design and the eventual price.

    The design and specification deliverable

    You receive a design pack rather than a single drawing. It sets out the category and grade selected for each area with the reasoning, a floor-by-floor layout showing detector types and positions, sounder coverage with audibility calculations against BS 5839's dB(A) targets, control panel and power supply specification, a cause-and-effect matrix for every interface, and a wiring schedule with cable types and containment routes.

    • Category and grade justification by area
    • Detector type, spacing and coverage drawings
    • Sounder audibility calculations
    • Panel, repeater and power supply specification
    • Cause-and-effect matrix for door holders, dampers and AOVs
    • Cable specification, containment and first-fix guidance

    Common installation failures we're called in to fix

    Most faults we investigate on existing systems were installed correctly against a design that was already wrong, or installed against no design at all. Frequent issues include detectors sited too close to kitchens or bathrooms causing nuisance alarms and subsequent disabling by frustrated occupants, sounders that cannot be heard over background noise in plant rooms or laundries, radio-linked domestic alarms in HMOs left unlinked after a battery change, and cause-and-effect programming that releases fire doors on the wrong zone. We also see systems maintained under a servicing contract that never received the original design documentation, so each engineer visit is effectively guesswork. Fixing these properly usually means a fresh survey and a corrected design, not just a call-out repair.

    Scope and pricing drivers

    Design fees are driven by the number of areas requiring separate category or grade decisions, the building's use mix, and how much existing documentation is usable. Installation cost is driven separately by the number of detection and sounder points, cable routes and containment (surface versus chased or concealed), integration with door holders, dampers, smoke shafts or a suppression system, and access constraints such as occupied premises requiring out-of-hours work. Portfolios of similar HMOs or flats benefit from a standardised design that reduces per-property design time, which we reflect in the price when quoting more than one property together.

    Aftercare, servicing and false alarm reduction

    A commissioned system needs weekly user testing and six-monthly servicing under BS 5839 to remain compliant and reliable. We hand over a service schedule with the commissioning certificate so the responsible person knows what is required and when. Where a building has a history of false alarms, we can review call logs, reposition or reclassify problem detectors, and adjust cause-and-effect settings so that fire brigade attendance is not triggered unnecessarily — persistent false alarms carry both a cost and a real risk that occupants stop responding to the alarm. We remain contactable after handover if a servicing engineer, insurer or building control officer has a question about the original design intent.

    Scope and price

    What it costs and how it runs.

    Indicative bands, confirmed as a fixed price before we book anything in.

    Indicative prices

    PropertyTypical scopePrice from
    Single flat or small officeBS 5839-6 or single-zone BS 5839-1 designfrom £199
    HMO, up to 6 occupantsGrade A/D design, category selection, cause-and-effect£249–£399
    Block of flats, communal systemL1–L3 design, door holder and AOV interfaces£399–£950
    Commercial premises, single unitFull BS 5839-1 design and specification£299–£750
    Installation & commissioningPriced from the agreed design, per point and cable routequoted separately
    Portfolio of similar propertiesStandardised design across multiple unitsvolume pricing on request
    Bands only — every building is priced on floors, units and complexity.

    From enquiry to report

    1. Survey1–2 hours per building

      Site visit to record layout, use and existing infrastructure.

    2. Design brief2–5 working days

      Category, grade and layout drawings issued for approval.

    3. Installationvaries by scope

      Contractor installs to the approved design and cause-and-effect matrix.

    4. Commissioninghalf to full day

      Every device, sounder, interface and power supply tested and logged.

    5. Handoversame day

      Certificate, logbook, as-fitted drawing and servicing schedule issued.

    The difference

    Us versus a typical assessment.

    Most of the reports we are asked to review were produced remotely, from a template, by someone who never saw the building.
    Comparison between Fire Risk Specialists and a typical commodity fire risk assessment for Fire alarm design
    AspectFire Risk SpecialistsTypical assessment
    Category selectionCategory chosen from building use and fire strategyDefault category regardless of risk
    StandardBS 5839-1 design and commissioningInstaller-led design with no formal brief
    HMO alignmentAligned to LACORS guidance and licensingGeneric domestic alarm
    DocumentationCommissioning cert, logbook and as-fitted drawingBasic test certificate only
    InterfacesCause-and-effect for door holders, dampers, AOVsNot always considered
    AftercareMaintenance schedule and annual servicing adviceNo ongoing support

    How fast

    How quickly we can get to you.

    Standard bookings in London are attended within two to five working days. When you have a deadline, this is what happens instead.

    Today

    Same-day survey where we can

    We hold short-notice capacity across London every working day. Call and you get a straight yes or no for your postcode on that call, not a maybe.

    Within 24 hours

    Urgent instructions attended

    Deadline work — a notice, a licence, an insurance renewal, a stalled sale — is placed ahead of the routine diary rather than queued behind it.

    24 hours after the survey

    Written PAS 79 report

    Written by the assessor who attended, with photographs and a prioritised action plan. Anything urgent is raised on site, not held back for the document.

    Same-day attendance depends on assessor availability, the size of the building and access being arranged. We tell you honestly on the call whether today is possible.

    Before you book

    The honest answers.

    The six things people ask us before instructing — answered without the sales pitch.

    I have been quoted less elsewhere.

    Cheaper quotes are usually desktop reviews or template reports written without a site visit. Ours starts at £99 and always includes an assessor physically walking the building. If you have a cheaper written quote for the same scope, send it over and we will tell you honestly whether it covers you.

    I need it this week.

    Most visits are booked within a few working days and the written report follows within 24 hours of the assessor leaving site. If you have a licensing deadline, an insurer or a fire service inspection date, tell us the date when you enquire and we will work to it.

    How do I know the assessor is competent?

    Every assessment is carried out by an IFSM-registered assessor listed on the National Fire Risk Assessor Register — ours is ID 1576. Competence is exactly what an enforcing authority asks about first, and it is the one thing a cheap report cannot evidence.

    Will the report actually be usable?

    It is written in plain English to British Standards PAS 79, with every finding tied to the duty it satisfies and a prioritised action plan you can hand to a contractor or a managing agent without translation.

    I have more than one building.

    Portfolios are what we do most. One visit schedule, one reporting format, one renewal calendar, and pricing that drops from the second property onwards.

    What if something is found?

    Findings are ranked so you know what has to happen now, what can be planned, and what is advisory. We do not inflate a report to sell remedial work — and we will talk you through the actions on the phone at no cost.

    How it works

    From enquiry to compliant.

    1. 01

      Quote

      Priced in minutes, online or over the phone.

    2. 02

      Book

      Survey slots within days, same-day when urgent.

    3. 03

      Assess

      An in-house assessor attends and inspects in person.

    4. 04

      Report

      PAS 79 report and prioritised actions in 24 hours.

    Awais Sarwar, Founder and Managing Director of Fire Risk Specialists

    Assessor-led

    Awais Sarwar, MSc

    Founder & Managing Director · 10+ years · 1,000+ assessments

    “Every fire alarm design instruction is carried out in person by an IFSM-registered assessor — never passed to a subcontractor.”

    IFSM registered

    NFRAR ID 1576

    MSc Building Surveying · BSc Civil Engineering

    Currently studying an MSc in Philosophy

    Off the clock: cricket, board games, Pokémon TCG and finding London’s best food.

    About Awais

    Trusted by the teams we work for across London

    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood
    Audi
    Kia
    Car Giant
    GB News
    Budgens
    Pepe's Piri Piri
    Chicking
    Chaiwalla
    Zoomo
    Northwood

    Frequently asked questions

    More from us

    Related services.

    Areas we cover

    All 32 London boroughs, plus Essex, Kent, Surrey and Hertfordshire.

    Book your fire alarm design from £199.

    Tell us about the building and we will price it in minutes. In-house IFSM-registered assessors, PAS 79 report within 24 hours of the visit.
    020 3951 4856

    No obligation. We answer the same day.

    Last word

    Ready when you are.

    Tell us about your property or programme. We agree the scope, fee, visit and reporting times before booking.

    020 3951 4856
    Transparent pricing No obligation Clear, prioritised actions
    4.9 rated
    ·1,000+ done·
    NFRAR registered
    Call